The year, written down once.

Recurring work is scheduled against the season it protects against, not against whenever someone happens to remember it.

An illustrative cadence. Your calendar reflects your systems, your equipment ages, and what the property actually needs.

  1. Feb to Mar

    Before the thaw

    Meltwater arrives faster than the ground can take it.

    • Sump pump test and clean
    • Roof edge and ice dam review
    • Basement moisture baseline
  2. Apr to May

    Opening up

    The first warm weeks are the only cheap time to fix drainage.

    • Grade and drainage walk
    • Exterior seal and caulk review
    • Cooling system readiness
  3. Jun to Aug

    Systems and safety

    Equipment runs hardest when a failure is least convenient.

    • Dryer vent clean
    • Water heater sediment drain
    • Alarm and extinguisher check
  4. Sep to Nov

    Closing down

    Exterior work not done before the freeze waits until spring.

    • Heating system readiness
    • Exterior water shutoff
    • Gutter and downspout clear